Fast track project scope included fuel pipelines from port to mine, a range of structures from stores to residential areas, maintenance workshops and a variety of other non-process infrastructure at the remote site
Scopes developed “in parallel with design”
Design and build a state-of-the-art control room and administration building to attract city workers to remote location
Strict environmental preservation and aesthetic requirements for the control room construction including access road design and construction methodology
Highlights & Achievements
CPC inhouse systems used to design a state-of-the-art administration facility with architectural assistance
Ramp up of design teams and delivery of one off highly architectural design
Simultaneous delivery of other traditional mining style non-process infrastructure
Provision of efficient and accurate inventory and drawings to support effective logistics and efficient construction